Investor: power plant
Timeline: 06/2018 – 10/2018
Location: Lubliniec
Scope of works:
We installed the ERm6.0 1.8 boiler and economiser with technical installations on the K-751 system boiler room as part of the construction of a coal-fired steam grate boiler with a nominal capacity of 6t/h on the K-751 system boiler room for our client in Poland.
As part of this implementation, the following actions were performed:
- Dismantling of the OR16 boiler, testing of the boiler, pipelines and equipment around the boiler and flue gas ducts;
- Prefabrication of the boiler supporting structure;
- Prefabrication of flue gas ducts from the WS exhaust fan to the chimney with the flue pipe;
- Prefabrication of a temporary structure to protect the roof structure after disassembly of the bay for boiler assembly purposes;
- Assembly of the boiler support structure and adaptation of the foundations and level of the burner for the new boiler;
- Installation of new boiler type ERm6.0 1.8 with ECO, fittings and necessary preparatory projects;
- Assembly of pipelines with suspensions, flue gas ducts with insulation, coal chute and boiler testing.